Check the cost before running
Lesson 10.5 of 45 Short 1 min read Updated Oct 14, 2026
The "Run" button shows how many credits the run costs with the options you chose; change one and it updates.
10.5Check the cost before running
Video coming soon
Never run blind: the price is on the button itself.
- The "Run" button shows in brackets how many credits it costs and how long it usually takes.
- The cost depends on the model and the options you choose. If you change an option, the button updates.
- In a workflow that repeats a step for each item in a list, it may show a maximum: "up to N credits".
If the cost doesn't suit you, try other options or another model. More in plans and credits.
Was this helpful?